Shiraz University Mofateh Dormitory Block C Network Implementation Project
Shiraz University Mofteh Dormitory Block C Network Infrastructure Implementation Project
Project Overview
The network infrastructure implementation project at
Mofteh Dormitory, Block C, Shiraz University was carried out with the aim
of establishing a stable, high-speed, and scalable communication infrastructure
for a 10-story residential building.
Considering the high number of residential units and the need for reliable network
access, the project included the design and implementation of structured cabling,
fiber optic infrastructure, network equipment installation, and wireless network deployment.
The technical team of Dargah Ertebatat Novin completed the full passive
network infrastructure implementation, equipment installation and organization,
wireless access point deployment, testing, and final documentation within a five-day
execution period.
Project Implementation Structure
The project was executed in a 10-story building consisting of 10 residential units
(flats) on each floor. To provide proper wireless coverage, a dedicated
Access Point was planned and installed for each flat.
To establish a reliable and standardized communication infrastructure, fiber optic
links were implemented between floors, while internal network cabling and equipment
connections were installed according to structured cabling standards.
Technical Details and Implementation Activities
- Implementation of network infrastructure for a 10-story dormitory building
- Network coverage design for 10 flats on each floor
- Planning and deployment of wireless access points for residential units
- Installation and organization of 9 network racks
- Implementation of 600 meters of fiber optic cabling
- Implementation of 3,660 meters of network cabling
- Installation of 900 meters of Boliga cable conduit for cable protection and routing management
- Installation and commissioning of 60 wireless access points
- Network testing, inspection, and labeling of all cabling paths
- Preparation of network drawings and final infrastructure documentation
Implemented Services and Solutions
- Design and implementation of enterprise-grade passive network infrastructure
- Structured network cabling and fiber optic installation between different building sections
- Installation and organization of network racks
- Wireless infrastructure deployment and Access Point installation
- Implementation of standard cable protection pathways and conduits
- Network testing, labeling, and technical documentation
Project Outcomes
The successful completion of this project equipped
Mofteh Dormitory, Shiraz University with a standardized and scalable network
infrastructure, enabling reliable communication services and comprehensive wireless
coverage for users.
The implementation of fiber optic connectivity, structured cabling, network equipment
installation, and complete documentation improved network performance, simplified
infrastructure management, and prepared the environment for future expansion and upgrades.
Project Specifications
| Specification | Details |
|---|---|
| Project Name | Shiraz University Mofteh Dormitory Block C Network Infrastructure Implementation |
| Project Type | Network Infrastructure, Fiber Optic, and Wireless Implementation |
| Building Structure | 10 Floors |
| Installed Network Racks | 9 Racks |
| Fiber Optic Cabling | 600 Meters |
| Network Cabling | 3,660 Meters |
| Wireless Access Points | 60 Units |
| Execution Duration | 5 Days |
پروژه های مرتبط
دراینجا پروژه های مرتبط را مشاهده می کنید.
No comment for this post.